The consortium led by Slovenian builder Kolektor CPG has been selected for the second section of the new railway between Koper and Divača after it had already won the contract for the first section as the only bidder left.
This post was originally published on STA.
Print
Share
Comment
Cite
Upload
Translate

APA
STA | Refugee Watch (2022-05-22T11:42:28+00:00) » Kolektor CPG to build entire length of Koper-Divača track. Retrieved from https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/.
MLA" » Kolektor CPG to build entire length of Koper-Divača track." STA | Refugee Watch - Wednesday March 17, 2021, https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/
HARVARDSTA | Refugee Watch Wednesday March 17, 2021 » Kolektor CPG to build entire length of Koper-Divača track., viewed 2022-05-22T11:42:28+00:00,<https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/>
VANCOUVERSTA | Refugee Watch - » Kolektor CPG to build entire length of Koper-Divača track. [Internet]. [Accessed 2022-05-22T11:42:28+00:00]. Available from: https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/
CHICAGO" » Kolektor CPG to build entire length of Koper-Divača track." STA | Refugee Watch - Accessed 2022-05-22T11:42:28+00:00. https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/
IEEE" » Kolektor CPG to build entire length of Koper-Divača track." STA | Refugee Watch [Online]. Available: https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/. [Accessed: 2022-05-22T11:42:28+00:00]
rf:citation » Kolektor CPG to build entire length of Koper-Divača track | STA | Refugee Watch | https://www.refugee.watch/2021/03/17/kolektor-cpg-to-build-entire-length-of-koper-divaca-track/ | 2022-05-22T11:42:28+00:00
https://github.com/addpipe/simple-recorderjs-demo